
M. Yousef Alramzi KEE 2025
Pacific Hydro Engineering designed a pump station to divert wastewater to the San Luis Rey Plant. Featuring a four-pump system, HDPE piping, and flood-compliant site design, the $5.3M project ensures energy efficiency, reliability, and regulatory compliance.

If you would like to use any information from the slides, just copy the citation below for reference
Alramzi, Y., Aghaei, Y., Badami, M. M., Aldekheel, M., Tohidi, R., & Sioutas, C. (2025). Urban emissions of fine and ultrafine particulate matter in Los Angeles: Sources and variations in lung-deposited surface area. Environmental Pollution (1987), 367, Article 125651. https://doi.org/10.1016/j.envpol.2025.125651